RIATOMSK.RU
-6°C
24 апреля 2024  |  
9:16
  |  
-6°C
3:20 PM  June 23, 2017

TEMP to start producing of blowoff valves for Gazprom in September

© РИА Томск. Павел СтефанскийTEMP to start producing of blowoff valves for Gazprom in September

TOMSK, Jun 23 – RIA Tomsk. Tomsk Electromechanical Plant (TEMP) is completing the construction of a new production line, where import-substituting blowoff valves for Gazprom enterprises will be produced, the press service of the regional administration said on Friday.

Earlier it was reported that within the framework of the agreement with the leadership of the Tomsk region and TEMP, Gazprom will create by mid-2017 on the basis of the plant a high-tech production of blowoff and adjusting valves and electric drives which will be used by the holding's structures. It was specified that Gazprom will invest 1.5 billion rubles in the project, but will receive tax exemptions on profits and property enlisted to the treasury of the region.

"The Tomsk Electromechanical Plant ... will soon begin mass production of import-substituting antisurge valves. They are designed to regulate the flow of gas and liquids at hydrocarbon production and transportation facilities and will be supplied for the production needs of Gazprom", – is said in the message. As the source familiar with the situation specified RIA Tomsk, production will be started in September.

The release also notes that within the framework of the gasification program of the Tomsk region in 2017, Gazprom plans to begin construction of six inter-settlement gas pipelines and two gas distribution stations (GDS) in Asino, Zyryansk, Pervomaisk, Tomsk and Shegarsk districts. The design of the gas pipeline to the village of Starokuskovo with the tap to the village of Novokuskovo of the Asinovskiy district was also started.

© с сайта администрации Томской области

"Over the past five years, our region developed a special relationship with Gazprom. Together we revived the frozen gasification program, the first in the country started the import substitution program in Tomsk industrial production, started large-scale infrastructure projects in the regional center", – the head of the region Sergey Zhvachkin is quoted in the message.

Earlier it was reported that cooperation of the enterprises of the Tomsk region and Gazprom within the framework of the "road maps" began in 2013. Thanks to it in 2016 the Tomsk enterprises delivered to Gazprom group of companies the equipment and materials for 3,5 billion rubles at the expense of what production of machinery and equipment grew in the region by 12,4%.

Наверх
Сайт РИА Томск /riatomsk.ru/ содержит информацию, подготовленную Региональным информационным агентством "Томск" (РИА Томск) с территорией распространения – Российская Федерация, зарубежные страны.
РИА Томск зарегистрировано в Федеральной службе по надзору в сфере связи, информационных технологий и массовых коммуникаций (Роскомнадзор) 06 ноября 2019 г. Свидетельство о регистрации ИА № ФС 77-77122.
Настоящий ресурс может содержать материалы 18+. Материалы, размещенные на правах рекламы, выходят под знаком "#" и/или "реклама". РИА Томск не несет ответственности за партнерские материалы.
Рейтинг@Mail.ru
Яндекс.Метрика
ЧИТАЙТЕ
РИА в VK
Главные новости дня в нашей рассылке